Construction sites
Worksites: management criteria
Autostrada Pedemontana Lombarda adopts a worksite management model based on rigorous standards and advanced planning, combining technological innovation with constant attention to safety and comfort for both road users and operational staff. Each intervention is planned with the utmost care to minimise disruption to traffic flow, with non-emergency works preferentially scheduled during time slots and days with a lower risk of congestion. Operational solutions are designed to ensure traffic fluidity and driving safety.
The technologically advanced nature of the infrastructure, together with a real-time monitoring system, allows potential issues to be anticipated and mitigated. This enables timely interventions and dynamic adjustments to worksite phases according to actual traffic conditions. Completing this approach is a clear and timely communication strategy with users, which contributes to ensuring that mobility along the managed sections remains smooth, predictable, and reliable every day.
The table below shows, in percentage terms, the impact of non-emergency worksites on the network under concession to Autostrada Pedemontana Lombarda over the past 12 months, offering a concise overview of their overall effect on traffic flow:
Month | jul-24 | aug-24 | sep-24 | oct-24 | nov-24 | dec-24 | gen-25 | feb-25 | mar-25 | apr-25 | may-25 | jun-25 | Average |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Lane unavailability index (%) (*) | 0,82 | 0,35 | 0,71 | 0,52 | 0,18 | 0,14 | 0,03 | 0,39 | 0,48 | 0,05 | 0,04 | 0,17 | 0,39 |
(*) Night-time worksites and those located on emergency lanes and motorway ramps are excluded.
Construction sites active or planned on a quarterly basis, lasting more than 5 days
Highway | Event | Description | Date |
---|---|---|---|
Sorry | No | event | available |
Active and scheduled construction sites within 7 days
Highway | Event | Description | Date |
---|---|---|---|
Sorry | No | event | available |